Before-signing checklist

Review the subcontract in the order risk usually hits your shop.

Use this as a practical pass before you sign: payment first, then scope, schedule, liability, dispute process, and closeout. It is a business-review checklist, not legal advice.

Upload a subcontract
01

Payment review

Pay-if-paid / pay-when-paid

A millwork shop has payroll, material bills, finishing labor, trucking, and install crews to pay whether or not the owner pays the GC on time.

Look for

condition precedent, payment by owner, if contractor is paid

Ask for

A fixed payment window after your approved invoice or completed work.

Read the guide
02

Cash-flow review

Retainage

Millwork often finishes before the entire project closes. If retainage waits on unrelated trades, your profit can sit locked up for months.

Look for

retainage, retention, final completion

Ask for

Release retainage after your scope is accepted, not after the whole project closes.

Read the guide
03

Payment paperwork

Lien waiver / payment bond claim waiver

A shop's leverage is strongest before rights are waived. Once an unconditional waiver is signed, getting paid can become much harder.

Look for

unconditional waiver, waive lien rights, upon execution

Ask for

Use conditional waivers until good funds are received.

Read the guide
04

Field-change control

Change order / extra work

Millwork changes are expensive. Field dimensions shift, finishes change, hardware gets substituted, and schedule pressure makes verbal approvals tempting.

Look for

prior written change order, no extras, directed work

Ask for

Email approval or field authorization counts while formal change order paperwork catches up.

Read the guide
05

Schedule-risk review

Liquidated damages / delay damages

Millwork is often late-sequence work. Your install window can be squeezed by problems that happened months before your crew arrived.

Look for

liquidated damages, time is of the essence, no damages for delay

Ask for

Damages only to the extent caused solely by your shop.

Read the guide
06

Liability review

Indemnity / hold harmless / defense

One broad indemnity clause can create exposure far larger than the profit on the job.

Look for

indemnify, hold harmless, defend

Ask for

Limit indemnity to claims caused by your negligent acts or omissions.

Read the guide
07

Document-control review

Flow-down / incorporation by reference

A shop cannot price, schedule, insure, or manage obligations it has not seen.

Look for

prime contract, incorporated by reference, flow down

Ask for

Attach the prime contract and all general conditions before signing.

Read the guide
08

Default and deduction review

Backcharge / default and cure

Backcharges can turn into a catch-all bucket for cleanup, protection, acceleration, damage, or coordination problems caused by multiple trades.

Look for

backcharge, supplement, deduct

Ask for

Written notice describing the specific problem and location.

Read the guide
09

Claim-path review

Dispute resolution / arbitration / venue

A small shop can be right on the facts and still lose leverage if the process is expensive, far away, or controlled by the GC.

Look for

arbitration, venue, jury trial

Ask for

Mutual dispute options, not GC-only election rights.

Read the guide
10

Scope and exclusions review

Scope / complete work / incidental work

Custom millwork bids are built from drawings, specs, assumptions, exclusions, and shop capacity. Vague scope language can wipe out that careful pricing.

Look for

complete scope, reasonably inferable, incidental work

Ask for

Attach and control your proposal, inclusions, exclusions, and assumptions.

Read the guide
11

Cancellation-risk review

Termination for convenience

Millwork shops commit early. Material, hardware, finish samples, engineering, shop drawings, and fabrication time can be sunk before install begins.

Look for

termination for convenience, without cause, only work performed

Ask for

Payment for work performed, stored material, custom orders, committed costs, and reasonable demobilization.

Read the guide